SERVICES & SOLUTION

"M/S. R. K ENGINEERING" HAS AN EXPERIENCE IN SUPPLIER & IMPORTER OF SUB-STATION EQUIPMENT’S AND MANUFACTURER OF ELECTRICAL SUBSTATION, HT PANEL, LT PANEL, ATS, COS, MDB, DB, SDB, LOW VOLTAGE & ALL KINDS OF ELECTRICAL GOODS ALSO ELECTRICAL COMPLIANCE IN INDUSTRIAL & RMG (READY MADE GARMENTS) SECTors in Bangladesh.

ELECTRICAL SAFETY ASSESSMENT (ESA):

  • ASSESSMENT OF ELECTRICAL SAFETY AT INDUSTRIES ON BEHALF OF ALLIANCE, ACCORD, ILO, AND OTHERS BYERS.
  • PREPARED INITIAL ELECTRICAL SAFETY ASSESSMENT REPORT (ESAR).
  • DETAILED ASSESSMENT OF ELECTRICAL SYSTEM FOR FIRE SAFETY (DEEP DIVE) AT INDUSTRIES ON BEHALF OF WALMART, C&A, HNM AND PREPARED ELECTRICAL ASSESSMENT REPORT.
  • ASSESSMENT OF ELECTRICAL SYSTEM FOR INDUSTRIES RISK ASSESSMENT (TIER-1/LAVEL-1) AT FACTORIES ON BEHALF OF WALMART, C&A AND OTHERS BUYERS.
  • CORRECTIVE ACTION PLAN (CAP) FOR ASSESSMENT OF ELECTRICAL SYSTEM FOR FIRE SAFETY (DEEP DIVE) AT FACTORIES ON BEHALF OF WALMART, C&A AND HNM.
  • ELECTRICAL INSPECTION AND CHECK THE ELECTRICAL SYSTEM (HT/LT PANELS, TRANSFORMERS, MDB, DB & SDB, PROTECTION SYSTEM, ELECTRICAL PANEL BOARDS INCLUDING SWITCH GEAR, ACB, GROUNDING SYSTEM), GENERATOR ETC. ACCORDING TO (A) BANGLADESH NATIONAL BUILDING CODE (BNBC) 2006 – ELECTRICAL PART. (B) BANGLADESH ELECTRICITY RULES (BER) 1937–APPROPRIATE SECTIONS (C) APPROPRIATE PARTS OF THE NFPA 70 EDITION 2011.
  • MEASUREMENT OF CURRENT, VOLTAGE, RESISTANCE ETC.
  • MEASUREMENT OF CABLE INSULATION RESISTANCE (IR) TEST.
  • MEASUREMENT OF EARTH PIT RESISTANCE (ER) TEST.
  • THERMOGRAPHIC SCANNING TEST OF ELECTRICAL SYSTEM.
  • DRAWING OF ELECTRICAL SINGLE LINE (SLD), AS-BUILT OF SLD & LAYOUT DRAWING FOR ALL POWER OUTLETS.
  • DRAWING OF LIGHTNING PROTECTION SYSTEM (LPS) AND AS-BUILT OF LPS.
  • MATERIALS SUPPLY WITH INSTALLATION OF LIGHTNING PROTECTION SYSTEM (LPS).
  • INSTALLATION OF HIGH TENSION (HT) PANEL, LOW TENSION (LT) PANEL, POWER FACTOR IMPROVEMENT (PFI), ATS, CHANGE OVER SWITCH (COS), MAIN DISTRIBUTION BOARD (MDB), DISTRIBUTION BOARD (DB) & SUB DISTRIBUTION BOARD (SDB).
  • SUPPLY OF HIGH TENSION (HT) PANEL, LOW TENSION (LT) PANEL, POWER FACTOR IMPROVEMENT (PFI), ATS, CHANGE OVER SWITCH (COS), MAIN DISTRIBUTION BOARD (MDB), DISTRIBUTION BOARD (DB) & SUB DISTRIBUTION BOARD (SDB).

Information

All images are for demonstration purpose only. You will get the demo images with the QuickStart pack.

Also, all the demo images are collected from Unsplash. If you want to use those, you may need to provide necessary credits. Please visit Unsplash for details.

Webmail Service